Trail Work Day September 24 – Handbuilt Singletrack Mt Hood

singletrack mt hoodTrail Work Day – Cooks Meadow Singletrack Mt Hood

The 44 Trails zone just got its first significant rainfall in many weeks. This bodes well for trail conditions on the biggest network of handbuilt singletrack Mt Hood has to offer and for the 44 Trails Association trail work day on September 24.

We’ve had two great trail days to build out the new Cooks Meadow extension trail and we will focus our efforts on Saturday September 24 to finalize the new singletrack trail.

Hardhats (bike helmets ok), long pants, work gloves and work boots REQUIRED!

WHEN: 
Saturday Sept 24, 2016 @ 9am – 2pm
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Handbuilt singletrack on Cooks Meadow Extension trail.

We will be putting in the final connection and will need FLAT SHOVELS, METAL RAKES and McLEODS.

Want to know more about the trail? check out the map

Aug 20 Trail Work Day

August 20 Cooks Meadow Extension Hand-Built Singletrack
mt hood single track

Saturday, Aug 20 is our is our next full-scale trail work day of the season, and we will be working on the Cooks Meadow Extension Trail.

We made great progress in July and look forward to more good work on Saturday Aug 20. We need you, of course, plus Metal Rakes, a few McLeods and some flat shovels

WHEN: 
Saturday Aug 20, 2016 @ 9am – 2pm
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group.

PROJECT:
Hand-Built tread work on Cooks Meadow Extension trail.

TOOLS:
Helmet/hardhat REQUIRED!!! (bike helmets ok), long pants gloves, and work boots required.
Hand tools – METAL RAKES ARE TOOL OF CHOICE

We’ll probably work ’til about 2pm and will have sandwiches from the awesome NYC City Sub Shop in Hood River for the crew.

Although the trail is arguably just roughed in, it can be ridden, especially the lower half. In fact, riding it will help establish it. So, bring your bike for an aprés trail work pedal!

Want to know more about the trail? check out the map

Surveyor’s Ridge Trail Re-Route

Surveyor’s Ridge Trail Re-Route

single track trail constructionThe Mt Hood National Forest announced their decision to authorize the re-route of approximately three miles of the Surveyor’s Ridge trail (trail #668) where it parallels the current water pipeline for The Dalles – near the start of Surveyor’s.

The project is necessary because of a comprehensive project to update The Dalles Watershed Pipeline that will interrupt and conflict with the existing Surveyor’s trail infrastructure. In addition, the Barlow District Ranger, Kameron Sam, authorized the adoption of the pipeline project staging area into a new recreational user parking/staging area once the pipeline project is complete. This is all good news for the multi-use trail system accessible from Forest Road 44.

Here’s the quick snip directly from the decision document to support the Surveyor re-route. Read full Surveyor’s decision document here.

DESCRIPTION OF DECISION

“It is my decision to authorize the rerouting of approximately 3 miles of the existing Surveyors Ridge Trail #688 where it follows the Dalles Pipeline. The north end of the reroute would provide a short loop approximately .7 miles in length for non-motorized recreationists looking for a short distance trail opportunity. The reroute would also connect Surveyors Ridge Trail directly to the Super Connector. The area that will be used for staging for reconstruction of the pipeline would become a trailhead 1.5 acres in size. The trailhead would provide needed centralized parking for the trail system in the vicinity of Forest Road 44.

The existing Surveyors Ridge Trailhead would remain accessible; however, this trailhead is inadequate for the amount of use it receives. The new trailhead would be large enough to accommodate the amount of use the trail system receives. The segment of Surveyors Ridge Trail #688 that would be impacted by the pipeline replacement would remain open to non-motorized travel, although it would not provide the same semi-primitive experience it now provides.”

44 Trails hopes to slide this project into the trail work mix after we finish the Cooks Meadow Extension project early this fall. Stay tuned.

July 23 Cooks Meadow Extension Project

July 23 Cooks Meadow Extension Hand-Built Singletrack

hand-built singletrackHey there 44 Trails riders!

Saturday, July 23 is our first full-scale trail work day of the season, and we will be working on the Cooks Meadow Extension Trail.

We’ve been hard at work prepping the area and now it’s hand-built singletrack time!

We need you, of course, plus Metal Rakes, a few McLeods, flat shovels and sets of loppers.

Helmets/hardhats (bike helmets ok) are required as are long pants, work boots and gloves.

We’ll probably work ’til about 2pm and will have sandwiches from the awesome NYC City Sub Shop in Hood River for the crew.

Working the pin line on the Cooks Meadow Extension - what a view!

Working the pin line on the Cooks Meadow Extension – what a view!

Although the trail is arguably just roughed in, it can be ridden, especially the lower half. In fact, riding it will help establish it. So, bring your bike for an aprés trail work pedal!

Want to know more about the trail? check out the map

WHEN: 
Saturday July 23, 2016 @ 9am – 2pm
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group.

PROJECT:
Hand-Built tread work on Cooks Meadow Extension trail.

TOOLS:
Helmet/hardhat (bike helmets ok), long pants gloves, and work boots required.
Hand tools – METAL RAKES ARE TOOL OF CHOICE

hood river singletrack