Surveyor’s Ridge Trail Work – June 8, 2019

44T-surveyors ridge trailBig thanks to everyone who joined us on the May 25 work day!
We are back at it this coming Saturday, June 8 to continue working on the Surveyor’s Ridge reroute project

Help us create hand-built singletrack!

We will be doing light tread work and brushing of the reroute. The new trail creates four miles of singletrack and improves interconnectivity to trails in the vicinity by connecting with the Super Connector, Cooks Meadows and the Superduper Connector.

WHEN: 
Saturday June 8, 2019 @ 9am – 2pm
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR at the sign-in and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Light duty brushing and treadwork on Surveyor’s ridge re-route.

TOOLS: 
Helmet or Hardhat REQUIRED (bike helmets ok)
Long pants, gloves and work boots REQUIRED
Water – please bring drinking water for yourself
Please bring your hand tool of choice: Flat Shovel, McCleod, Loppers, Metal Rake, Pulaskis.

TRAIL CONDITIONS UPDATE
And more trails are open! You can add Fifteen Mile and Cedar Creek to the list of open trails, which includes: Knebal Springs, Eightmile, Bottle Prairie, Superconnector, Surveyors and Dog River.

Some lingering snow and mud persist above 4500 feet. So High Prairie and 450 are not quite open for riding.

Can’t join us? Donate to help fund future trail projects in the 44 zone!

Trailwork Day Oct. 20, 2018

Fall Trailwork Day Number II – October 20

We need your help to finish the project this fall! Come on up to the 44 zone on Saturday, Oct 20 to help us finish up!

The new route adds single track miles and reroutes the trail away from The Dalles Watershed Pipeline, which is about to get replaced, thus disrupting the original Surveyor’s route. READ MORE about the Surveyor’s Ridge Reroute Project and check out project map.

Trailwork Day – Surveyor’s Ridge Reroute Project SATURDAY OCTOBER 20, 2018

WHEN: SATURDAY OCTOBER 20, 2018 @ 9am – 2pm
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee at signin thanks to Dog River Coffee in HR and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Handbuilt singletrack on Surveyor’s ridge re-route. We are working on a variety stages right now – rough-in, finish work and brushing.

TOOLS:
Please bring your own tools! Flat shovels, polaskis, McLeods, metal rakes, loppers are all good options.

*REQUIRED EQUIPMENT*
Hardhats (bike helmets ok), long pants, work gloves and work boots.

Can’t make it? Make a donation!

Surveyor's Ridge Trail Reroute

Here is the map showing the approximate route of the Surveyor’s Ridge trail project. The existing trail (yellow) will be disrupted by the new pipeline – the new route (blue) shows the tentative routes to connect with the SuperConnector (brown) near the 17 Road.

44 Trails Summer Trail Work Schedule – help finish the new Surveyor’s Ridge Singletrack

Mountain bike season is warming up in the lower Hood River Valley with excellent trail conditions from Post Canyon to Syncline. It will be another six weeks or more before the 44 single track trails are snow-free and ready to ride but we have our work schedule.

May 12 – Surveyor’s Ridge – the new single track connector is almost done – but we need your help to connect it all.

June 9 – Likely a second work day to get the new Surveyor’s single track fully rideable

Sept 22 – TBA

Oct 20 – TBA

Lots of new signage for the 44 trails ready for installation too!

44 trails single track mountain biking

Surveyor’s Ridge Re-Route Progress!

44 Trails Surveyor's Ridge Trail CrewHere’s a big thanks to the motivated crew that came out on August 12 to help work on the Surveyor’s Ridge re-route project! The team built some excellent trail!

You can now ride Surveyor’s Ridge (and we encourage you to do so) by parking at the 17/1720 junction and using the Super Connector to begin the ride (there is trailhead board on the 17 road just past the 1720 junction on your right). Or, for a longer ride, park at Knebal Campground and ride over to the Super Connector and all the way through Surveyor’s Ridge! Bike traffic will help “ride in” the trail.

We will post a map shortly outlining the new start and what is currently ready to ride. In the meantime, thanks to the crew that put in a solid day on Saturday!

Surveyor's Ridge Work day