Surveyor’s Ridge Reroute – trail work day August 12, 2017

Surveyor's Ridge TrailThe Surveyor’s Ridge Reroute Continues!

A segment of the Surveyor’s Ridge Trail #688 will be impacted by the City of The Dalles Watershed Pipeline replacement project. The vintage pipeline providing water to the City of The Dalles is being replaced with a modern version. A portion of the pipeline is adjacent to or beneath the south end of the Surveyors Ridge Trail. The pipeline project will permanently change the trail corridor in these locations -creating a 25 foot wide corridor with aggregate placed along the right-of-way.

We re working on a re-route of the Surveyor’s Ridge trail where it follows the pipeline to maintain a semi-primitive trail experience. The reroute also improves interconnectivity of trails in the vicinity by connecting with the Super Connector and will provide a short loop for beginner riders who want a shorter trail experience than Surveyors Ridge. READ MORE about the Surveyor’s Ridge Reroute Project and check out project map.

Trail Work Day – Surveyor’s Ridge Reroute Project

We will working on the Surveyor’s reroute doing the initial clearing and rough-in work that will establish the new route.

REQUIRE EQUIPMENT:
Hardhats (bike helmets ok), long pants, work gloves and work boots, water. 

WHEN: 
Saturday, August 12, 2017 @ 9am – 2pm (plenty of time for a post-work-project ride)
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Handbuilt singletrack on Surveyor’s ridge re-route. We will be doing rough in and route trimming/clearing.

TOOLS:
Surveyor's RidgeHelmet/hardhat (bike helmets ok), long pants, gloves, and work boots required.
Hand tools only – Pruning Saws, Flat Shovels, McCleods, Loppers, Metal Rakes (NO chainsaws please).

It gets warm up there – please be sure to bring water and sunscreen.

Surveyor's Ridge Trail Reroute

Here is the map showing the approximate route of the Surveyor’s Ridge trail project. The existing trail (yellow) will be disrupted by the new pipeline – the new route (blue) shows the tentative routes to connect with the SuperConnector (brown) near the 17 Road.

 

Trail Work Day – Saturday, July 22 – Surveyor’s Ridge Reroute Project

singletrack mt hoodTrail Work Day – Surveyor’s Ridge Reroute Project

Our first big trail work day of the summer is one week away – Sat July 22. We will working on the Surveyor’s reroute doing the initial trimming, clearing and rough-in work that will establish the new route. (The upper Surveyors route is being relocated to due to the pending large-scale Dalles Watershed pipeline project – and it’s a nice upgrade of the existing two-track start.)

Hardhats (bike helmets ok), long pants, work gloves and work boots REQUIRED!

WHEN: 
Saturday, July 22, 2017 @ 9am – 2pm (plenty of time for a post-work-project ride)
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Handbuilt singletrack on Surveyor’s ridge re-route. We will be doing initial rough in and route trimming.

TOOLS:
Helmet/hardhat (bike helmets ok), long pants, gloves, and work boots required.
Hand tools only – Pruning Saws, Flat Shovels, McCleods, Loppers, Metal Rakes (NO chainsaws please).

It gets warm up there – please be sure to bring water and sunscreen.

Trail Work Day September 24 – Handbuilt Singletrack Mt Hood

singletrack mt hoodTrail Work Day – Cooks Meadow Singletrack Mt Hood

The 44 Trails zone just got its first significant rainfall in many weeks. This bodes well for trail conditions on the biggest network of handbuilt singletrack Mt Hood has to offer and for the 44 Trails Association trail work day on September 24.

We’ve had two great trail days to build out the new Cooks Meadow extension trail and we will focus our efforts on Saturday September 24 to finalize the new singletrack trail.

Hardhats (bike helmets ok), long pants, work gloves and work boots REQUIRED!

WHEN: 
Saturday Sept 24, 2016 @ 9am – 2pm
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Handbuilt singletrack on Cooks Meadow Extension trail.

We will be putting in the final connection and will need FLAT SHOVELS, METAL RAKES and McLEODS.

Want to know more about the trail? check out the map

Surveyor’s Ridge Trail Re-Route

Surveyor’s Ridge Trail Re-Route

single track trail constructionThe Mt Hood National Forest announced their decision to authorize the re-route of approximately three miles of the Surveyor’s Ridge trail (trail #668) where it parallels the current water pipeline for The Dalles – near the start of Surveyor’s.

The project is necessary because of a comprehensive project to update The Dalles Watershed Pipeline that will interrupt and conflict with the existing Surveyor’s trail infrastructure. In addition, the Barlow District Ranger, Kameron Sam, authorized the adoption of the pipeline project staging area into a new recreational user parking/staging area once the pipeline project is complete. This is all good news for the multi-use trail system accessible from Forest Road 44.

Here’s the quick snip directly from the decision document to support the Surveyor re-route. Read full Surveyor’s decision document here.

DESCRIPTION OF DECISION

“It is my decision to authorize the rerouting of approximately 3 miles of the existing Surveyors Ridge Trail #688 where it follows the Dalles Pipeline. The north end of the reroute would provide a short loop approximately .7 miles in length for non-motorized recreationists looking for a short distance trail opportunity. The reroute would also connect Surveyors Ridge Trail directly to the Super Connector. The area that will be used for staging for reconstruction of the pipeline would become a trailhead 1.5 acres in size. The trailhead would provide needed centralized parking for the trail system in the vicinity of Forest Road 44.

The existing Surveyors Ridge Trailhead would remain accessible; however, this trailhead is inadequate for the amount of use it receives. The new trailhead would be large enough to accommodate the amount of use the trail system receives. The segment of Surveyors Ridge Trail #688 that would be impacted by the pipeline replacement would remain open to non-motorized travel, although it would not provide the same semi-primitive experience it now provides.”

44 Trails hopes to slide this project into the trail work mix after we finish the Cooks Meadow Extension project early this fall. Stay tuned.