Hospital Hill and Whoopdee Trail Fire Hazard Closure in Effect

Hospital Hill and Whoopdee Mountain Bike Trails

Fire Hazard Closure in Effect as of Midnight August 4, 2017

SDS & Kreps announced the closure of their land as of August 5, 2017 due to fire danger. This means Hospital Hill/Jewett Creek trails and the Whoopdee on the Old Dalles Road are all closed until we get some significant precipitation. Please respect this closure and spread the word.

Here is the announcement…
Local timberland companies are announcing that due to conditions of high fire danger all lands in Klickitat, Skamania, Yakima, Hood River and Wasco Counties will be closed to public entry starting August 5, 2017 until further notice. This closure includes the areas of Burdoin Mountain (aka Hospital Hill) and Underwood Mountain as well as the Whoopdee on the Old Dalles Road in Hood River and affects all lands owned or managed by the following parties: American Forest Management (DGS Timber, LLC), Broughton Lumber Company, Hancock Forest Management (John Hancock Life Insurance and Manulife), Kreps Ranch, Kreps Family LLC, Stevenson Land Company (SDS), and Western Pacific Timber, LLC.

Surveyor’s Ridge Reroute – trail work day August 12, 2017

Surveyor's Ridge TrailThe Surveyor’s Ridge Reroute Continues!

A segment of the Surveyor’s Ridge Trail #688 will be impacted by the City of The Dalles Watershed Pipeline replacement project. The vintage pipeline providing water to the City of The Dalles is being replaced with a modern version. A portion of the pipeline is adjacent to or beneath the south end of the Surveyors Ridge Trail. The pipeline project will permanently change the trail corridor in these locations -creating a 25 foot wide corridor with aggregate placed along the right-of-way.

We re working on a re-route of the Surveyor’s Ridge trail where it follows the pipeline to maintain a semi-primitive trail experience. The reroute also improves interconnectivity of trails in the vicinity by connecting with the Super Connector and will provide a short loop for beginner riders who want a shorter trail experience than Surveyors Ridge. READ MORE about the Surveyor’s Ridge Reroute Project and check out project map.

Trail Work Day – Surveyor’s Ridge Reroute Project

We will working on the Surveyor’s reroute doing the initial clearing and rough-in work that will establish the new route.

REQUIRE EQUIPMENT:
Hardhats (bike helmets ok), long pants, work gloves and work boots, water. 

WHEN: 
Saturday, August 12, 2017 @ 9am – 2pm (plenty of time for a post-work-project ride)
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Handbuilt singletrack on Surveyor’s ridge re-route. We will be doing rough in and route trimming/clearing.

TOOLS:
Surveyor's RidgeHelmet/hardhat (bike helmets ok), long pants, gloves, and work boots required.
Hand tools only – Pruning Saws, Flat Shovels, McCleods, Loppers, Metal Rakes (NO chainsaws please).

It gets warm up there – please be sure to bring water and sunscreen.

Surveyor's Ridge Trail Reroute

Here is the map showing the approximate route of the Surveyor’s Ridge trail project. The existing trail (yellow) will be disrupted by the new pipeline – the new route (blue) shows the tentative routes to connect with the SuperConnector (brown) near the 17 Road.

 

Trail Work Day – Saturday, July 22 – Surveyor’s Ridge Reroute Project

singletrack mt hoodTrail Work Day – Surveyor’s Ridge Reroute Project

Our first big trail work day of the summer is one week away – Sat July 22. We will working on the Surveyor’s reroute doing the initial trimming, clearing and rough-in work that will establish the new route. (The upper Surveyors route is being relocated to due to the pending large-scale Dalles Watershed pipeline project – and it’s a nice upgrade of the existing two-track start.)

Hardhats (bike helmets ok), long pants, work gloves and work boots REQUIRED!

WHEN: 
Saturday, July 22, 2017 @ 9am – 2pm (plenty of time for a post-work-project ride)
Meet 9am @ Little John SnoPark on Highway 35
We’ll have coffee thanks to Dog River Coffee in HR and sign-in at the SnoPark and then move up to the work site as a group. Lunch will be provided by NY City Subs in Hood River.

PROJECT:
Handbuilt singletrack on Surveyor’s ridge re-route. We will be doing initial rough in and route trimming.

TOOLS:
Helmet/hardhat (bike helmets ok), long pants, gloves, and work boots required.
Hand tools only – Pruning Saws, Flat Shovels, McCleods, Loppers, Metal Rakes (NO chainsaws please).

It gets warm up there – please be sure to bring water and sunscreen.

Wildflower Season and Great Trail Conditions

44 Trails mountain bike network - Bottle Prairie TrailIt’s wildflower season up the 44 Trails mountain bike network.

Trails are in prime condition right now! Beat the heat in Hood River and head to the Mt. Hood National Forest for some of the best trail conditions of the season.

The wild flowers are peaking and trails are riding great. We’ve got the bulk of the trail system cleared of downed trees and its just lingering high elevation spots and more remote trail sections (Boulder/Forest Creek/Gunsight Butte) that still have snow and/or blowdown. Lookout, Cooks, Knebal, Eightmile, Fifteenmile, Surveyors, Dog River, Bottle Prairie, etc are all good to go.

44 Trails mountain bike network wildflower season